Backup Strategy - Task 2.4

Task 2.4: Create Backup Strategy

Date: 2025-01-23 Purpose: Establish comprehensive backup plan to ensure no data loss during JAEGIS project reorganization

Backup Strategy Overview

🎯 Multi-Level Backup Approach

  1. Complete project backup before any changes

  2. Incremental backups at each phase

  3. Critical file snapshots before high-risk operations

  4. Rollback-ready backups with quick restore capability

Backup Levels and Scope

πŸ”’ Level 1: Complete Project Backup

Full System Snapshot

Backup scope: Entire JAEGIS project directory
Backup location: JAEGIS-backup-YYYYMMDD-HHMMSS/
Backup method: Complete directory copy
Timing: Before any reorganization begins

Files included:
  - All source files (src/)
  - All documentation (docs/, JAEGIS-agent/*.md)
  - All scripts (*.ps1, *.bat, *.sh, *.py, *.js)
  - All configuration (*.json, *.cfg, *.service)
  - Build artifacts (dist/, out/)
  - Dependencies (node_modules/) - optional
  - Logs and diagnostics

Files excluded:
  - Temporary files (__pycache__/)
  - Large dependencies (node_modules/) - if space constrained
  - Build caches
  - User-specific files

Backup Verification

πŸ”„ Level 2: Phase-Based Incremental Backups

Phase Backup Strategy

πŸ“ Level 3: Critical File Snapshots

High-Risk File Backups

Snapshot Timing

Backup Implementation Strategy

πŸ“‹ Implementation Method: Documentation-Based

Since direct file operations are limited, we'll use a documentation-based backup approach:

Step 1: Document Current State

Step 2: Create Backup Manifests

Step 3: Validation Baselines

πŸ”§ Backup Validation Process

Backup Completeness Check

Backup Accessibility Test

Rollback Procedures

πŸ”„ Rollback Triggers

🚨 Rollback Execution

Level 1: Reference Rollback

Level 2: File Location Rollback

Level 3: Complete System Rollback

Backup Storage and Management

πŸ“ Backup Organization

πŸ”’ Backup Retention Policy

Recovery Testing

πŸ§ͺ Recovery Validation

βœ… Recovery Success Criteria

Backup Implementation Plan

Phase 1: Pre-Reorganization Backup

Phase 2: Ongoing Backup Maintenance

Phase 3: Post-Reorganization Validation

Next Steps

  1. Create current state documentation (immediate)

  2. Establish backup manifests (before reorganization)

  3. Test rollback procedures (before reorganization)

  4. Begin reorganization with backup safety net

Status: βœ… TASK 2.4 COMPLETE - Comprehensive backup strategy established with multi-level protection and clear rollback procedures

Last updated