JAEGIS Project Risk Assessment and Impact Analysis
Task 1.5: Risk Assessment and Impact Analysis
Executive Risk Summary
🎯 Overall Risk Level: MEDIUM-LOW
Risk Assessment by Category
🚨 CRITICAL RISKS (Must Prevent)
Risk C1: Core System Failure
Risk: JAEGIS-agent structure corruption or agent-config.txt damage
Probability: VERY LOW (files not being moved)
Impact: CATASTROPHIC (complete system failure)
Mitigation:
- Keep entire JAEGIS-agent structure in place
- Create backup before any changes
- Verify integrity after reorganization
- No modifications to agent-config.txt paths
Current Status: MITIGATED (no changes to core files)Risk C2: Build System Failure
Risk C3: Extension Loading Failure
⚡ HIGH RISKS (Require Careful Management)
Risk H1: User Interface Broken
Risk H2: Documentation Navigation Broken
Risk H3: Build Script Failures
📋 MEDIUM RISKS (Standard Management)
Risk M1: Service Functionality Reduced
Risk M2: Installation Issues
Risk M3: Development Workflow Disruption
🟢 LOW RISKS (Minimal Impact)
Risk L1: Documentation Organization
Risk L2: Temporary File Duplication
Impact Analysis by System Component
Core JAEGIS System (agent-config.txt + JAEGIS-agent/)
Build System (package.json, tsconfig.json, webpack.config.js)
User Interface (guidelines, instructions)
Documentation System
Automation Scripts
Risk Mitigation Strategy
Phase 1: Preparation (Risk Reduction)
Phase 2: Low-Risk Files First (Risk Validation)
Phase 3: Medium-Risk Files (Controlled Risk)
Phase 4: High-Risk Files (Maximum Care)
Contingency Plans
Scenario 1: Core System Issues
Scenario 2: Build System Failure
Scenario 3: User Interface Broken
Scenario 4: Multiple System Failures
Success Probability Assessment
Overall Success Probability: 85-90%
Success Criteria Validation
Recommended Approach
GO/NO-GO Decision: GO
Success Factors
Next Steps