JAEGIS Project Risk Assessment and Impact Analysis
Task 1.5: Risk Assessment and Impact Analysis
Date: 2025-01-23 Purpose: Comprehensive risk assessment for JAEGIS project file reorganization with mitigation strategies
Executive Risk Summary
๐ฏ Overall Risk Level: MEDIUM-LOW
Core system protected - JAEGIS-agent structure remains untouched
Main risks are build system and documentation references
Comprehensive backup and validation strategy mitigates most risks
Phased approach allows early detection and correction of issues
Risk Assessment by Category
๐จ CRITICAL RISKS (Must Prevent)
Risk C1: Core System Failure
Risk: JAEGIS-agent structure corruption or agent-config.txt damage
Probability: VERY LOW (files not being moved)
Impact: CATASTROPHIC (complete system failure)
Mitigation:
- Keep entire JAEGIS-agent structure in place
- Create backup before any changes
- Verify integrity after reorganization
- No modifications to agent-config.txt paths
Current Status: MITIGATED (no changes to core files)Risk C2: Build System Failure
Risk C3: Extension Loading Failure
โก HIGH RISKS (Require Careful Management)
Risk H1: User Interface Broken
Risk H2: Documentation Navigation Broken
Risk H3: Build Script Failures
๐ MEDIUM RISKS (Standard Management)
Risk M1: Service Functionality Reduced
Risk M2: Installation Issues
Risk M3: Development Workflow Disruption
๐ข LOW RISKS (Minimal Impact)
Risk L1: Documentation Organization
Risk L2: Temporary File Duplication
Impact Analysis by System Component
Core JAEGIS System (agent-config.txt + JAEGIS-agent/)
Build System (package.json, tsconfig.json, webpack.config.js)
User Interface (guidelines, instructions)
Documentation System
Automation Scripts
Risk Mitigation Strategy
Phase 1: Preparation (Risk Reduction)
Phase 2: Low-Risk Files First (Risk Validation)
Phase 3: Medium-Risk Files (Controlled Risk)
Phase 4: High-Risk Files (Maximum Care)
Contingency Plans
Scenario 1: Core System Issues
Scenario 2: Build System Failure
Scenario 3: User Interface Broken
Scenario 4: Multiple System Failures
Success Probability Assessment
Overall Success Probability: 85-90%
Success Criteria Validation
Recommended Approach
GO/NO-GO Decision: GO
Success Factors
Next Steps
Begin Phase 2: Directory Structure Creation with comprehensive backup
Start with lowest risk files to validate approach
Progress systematically through risk tiers
Validate thoroughly at each step
Status: โ TASK 1.5 COMPLETE - Risk assessment complete, reorganization approved with comprehensive mitigation strategy
RECOMMENDATION: PROCEED TO PHASE 2 with confidence in risk management approach