JAEGIS Project Risk Assessment and Impact Analysis

Task 1.5: Risk Assessment and Impact Analysis

Date: 2025-01-23 Purpose: Comprehensive risk assessment for JAEGIS project file reorganization with mitigation strategies

Executive Risk Summary

๐ŸŽฏ Overall Risk Level: MEDIUM-LOW

  • Core system protected - JAEGIS-agent structure remains untouched

  • Main risks are build system and documentation references

  • Comprehensive backup and validation strategy mitigates most risks

  • Phased approach allows early detection and correction of issues

Risk Assessment by Category

๐Ÿšจ CRITICAL RISKS (Must Prevent)

Risk C1: Core System Failure

Risk: JAEGIS-agent structure corruption or agent-config.txt damage
Probability: VERY LOW (files not being moved)
Impact: CATASTROPHIC (complete system failure)
Mitigation:
  - Keep entire JAEGIS-agent structure in place
  - Create backup before any changes
  - Verify integrity after reorganization
  - No modifications to agent-config.txt paths
Current Status: MITIGATED (no changes to core files)

Risk C2: Build System Failure

Risk C3: Extension Loading Failure

โšก HIGH RISKS (Require Careful Management)

Risk H1: User Interface Broken

Risk H2: Documentation Navigation Broken

Risk H3: Build Script Failures

๐Ÿ“‹ MEDIUM RISKS (Standard Management)

Risk M1: Service Functionality Reduced

Risk M2: Installation Issues

Risk M3: Development Workflow Disruption

๐ŸŸข LOW RISKS (Minimal Impact)

Risk L1: Documentation Organization

Risk L2: Temporary File Duplication

Impact Analysis by System Component

Core JAEGIS System (agent-config.txt + JAEGIS-agent/)

Build System (package.json, tsconfig.json, webpack.config.js)

User Interface (guidelines, instructions)

Documentation System

Automation Scripts

Risk Mitigation Strategy

Phase 1: Preparation (Risk Reduction)

Phase 2: Low-Risk Files First (Risk Validation)

Phase 3: Medium-Risk Files (Controlled Risk)

Phase 4: High-Risk Files (Maximum Care)

Contingency Plans

Scenario 1: Core System Issues

Scenario 2: Build System Failure

Scenario 3: User Interface Broken

Scenario 4: Multiple System Failures

Success Probability Assessment

Overall Success Probability: 85-90%

Success Criteria Validation

GO/NO-GO Decision: GO

Success Factors

Next Steps

  1. Begin Phase 2: Directory Structure Creation with comprehensive backup

  2. Start with lowest risk files to validate approach

  3. Progress systematically through risk tiers

  4. Validate thoroughly at each step

Status: โœ… TASK 1.5 COMPLETE - Risk assessment complete, reorganization approved with comprehensive mitigation strategy

RECOMMENDATION: PROCEED TO PHASE 2 with confidence in risk management approach