Backup Strategy - Task 2.4
Task 2.4: Create Backup Strategy
Date: 2025-01-23 Purpose: Establish comprehensive backup plan to ensure no data loss during JAEGIS project reorganization
Backup Strategy Overview
π― Multi-Level Backup Approach
Complete project backup before any changes
Incremental backups at each phase
Critical file snapshots before high-risk operations
Rollback-ready backups with quick restore capability
Backup Levels and Scope
π Level 1: Complete Project Backup
Full System Snapshot
Backup scope: Entire JAEGIS project directory
Backup location: JAEGIS-backup-YYYYMMDD-HHMMSS/
Backup method: Complete directory copy
Timing: Before any reorganization begins
Files included:
- All source files (src/)
- All documentation (docs/, JAEGIS-agent/*.md)
- All scripts (*.ps1, *.bat, *.sh, *.py, *.js)
- All configuration (*.json, *.cfg, *.service)
- Build artifacts (dist/, out/)
- Dependencies (node_modules/) - optional
- Logs and diagnostics
Files excluded:
- Temporary files (__pycache__/)
- Large dependencies (node_modules/) - if space constrained
- Build caches
- User-specific filesBackup Verification
π Level 2: Phase-Based Incremental Backups
Phase Backup Strategy
π Level 3: Critical File Snapshots
High-Risk File Backups
Snapshot Timing
Backup Implementation Strategy
π Implementation Method: Documentation-Based
Since direct file operations are limited, we'll use a documentation-based backup approach:
Step 1: Document Current State
Step 2: Create Backup Manifests
Step 3: Validation Baselines
π§ Backup Validation Process
Backup Completeness Check
Backup Accessibility Test
Rollback Procedures
π Rollback Triggers
π¨ Rollback Execution
Level 1: Reference Rollback
Level 2: File Location Rollback
Level 3: Complete System Rollback
Backup Storage and Management
π Backup Organization
π Backup Retention Policy
Recovery Testing
π§ͺ Recovery Validation
β
Recovery Success Criteria
Backup Implementation Plan
Phase 1: Pre-Reorganization Backup
Phase 2: Ongoing Backup Maintenance
Phase 3: Post-Reorganization Validation
Next Steps
Create current state documentation (immediate)
Establish backup manifests (before reorganization)
Test rollback procedures (before reorganization)
Begin reorganization with backup safety net
Status: β TASK 2.4 COMPLETE - Comprehensive backup strategy established with multi-level protection and clear rollback procedures
Last updated